Rehabilitation and Performance Health
Built from the partially completed shell of an existing, incomplete and uncommissioned pool, Greenway and our team, undertook a complex project to extend this indoor pool, requiring expanding the existing building surrounding it. With both pool water temperature and the poolside concourse temperature requiring a great deal of environmental and thermal control, care was taken to ensure that the surrounding concourse and the pool itself were built to the very highest standards. Challenges faced included extending the pool which was already built immediately on the boundary of the existing property, and also the installation and commissioning of a complex mechanical services system given the nature and specific needs of the mixed client groups.
From children with differing disabilities, to members of our older community and those with sporting and other rehabilitation requiring injuries, the pool will provide for the delivery of the highest levels of therapeutic and rehabilitation services, while at the same time providing a less than clinical environment from which to deliver them.