Babcock International Group Level 9 Fitout
After having undertaken a full floor fitout of Level 10 Babcock was growing rapidly and needed more space and engaged Greenway again to fitout another full floor in the same building. The central location and new premises lead to considerably more meetings than originally anticipated so a new suite of Client facing meeting rooms were developed off a new substantial Reception area to allow for the increase in visitation. These ranged in size for flexibility and included a new increased boardroom with an acoustic glazed operable wall so that a larger area could be created for events and functions. All new meeting rooms included seamless high-quality audio-visual technology.
Babcock was engaging further into the Defence sector and so the 64 new work areas and associated support spaces on this level were constructed to an appropriate security zone level with added acoustic privacy as part of the requirements.
Outside of this zone an Ideation and Collaboration area was developed adjacent a large and well catered Work Café. Feedback has been that all spaces work very efficiently, and visitors are impressed with the new facilities.